Yangzhou Dinghua Electronics Co., Ltd. special power supply production project self-inspection evaluation report publicity
Page view
[Abstract]:
(1) Project Overview
Project Name: Yangzhou Dinghua Electronics Co., Ltd. Special Power Supply Production Project
Location: No. 688, Yangling Road, Yucheng Town, Hanjiang District
Construction scale: 2,500 sets of special power supplies per year
(2) Passing three batches of problems to be solved
Improve the environmental protection procedures of Yangzhou Dinghua Electronics Co., Ltd. annual special power production project, and incorporate it into the normal management of one enterprise and one file.
(3) Key points of self-examination and evaluation report conclusions
(1) Industrial policy compliance
In accordance with the “Decision of the National Development and Reform Commission on Amending the Relevant Provisions of the Industrial Structure Adjustment Guidance Catalogue (2011)> (National Development and Reform Commission Order No. 21), this project does not belong to the restricted and eliminated projects specified therein. In line with the current national industrial policy.
(2) Planning compatibility
The project is located in Hangzhuang Formation, Qi Town, Hanjiang District, Yangzhou City. The land license number: Yangxun Collection (2014) No. 001, belongs to industrial land, and there is no plan for the location.
(3) Environmental impact of the project
Water pollution prevention and control measures: The domestic wastewater of this project is treated by the Yangling Road sewage pipe network and connected to the Tangwang Wastewater Treatment Plant for centralized treatment.
Noise pollution prevention measures: The noise of this project is mainly the noise of equipment operation. According to the monitoring data, the noise industry boundary can be discharged to the standard during the operation of the project. The acoustic environment quality of the current monitoring value can meet the corresponding functional area requirements.
Solid waste pollution prevention and control measures: garbage collection and collection, the disposal rate is up to 100%, domestic garbage is collected and transported by the sanitation department, and waste packaging materials are sold outside the material recovery unit.
(4) The total amount of construction projects can achieve regional balance
Wastewater: The domestic wastewater volume of the project is 170m3/a, of which the wastewater pollutants take-up volume: COD 0.085t/a, SS 0.068t/a, ammonia nitrogen 0.0006t/a, total phosphorus 0.0001t/a. Final discharge of water pollutants: COD 0.0085t/a, SS 0.002t/a, ammonia nitrogen 0.002t/a, total phosphorus 0.00009t/a. The total amount is balanced within the total amount of the Tangwang Wastewater Treatment Plant.
All solid wastes are comprehensively utilized or disposed of reasonably to achieve zero emissions and meet the requirements for total control.
In summary, the project meets the “three batches” registration conditions.